Archaeological Monitoring of The Forks Axial Pathway from Esplanade Riel (Pedestrian Bridge) to VIA Rail Station

Quaternary Consultants Ltd.

Monitoring of auger drilling included recording of soil stratigraphy but did not yield any artifacts. Stratigraphy is discussed in detail for each excavated component: water feature profiles; wet well profile; site drainage catchbasin; peace meeting interpretive node profiles; and tree planting trenches. The report concludes that the sub-surface components of the pathway had no impact on archaeological resources.

Quaternary Consultants Ltd.. 2003. Archaeological Monitoring of The Forks Axial Pathway from Esplanade Riel (Pedestrian Bridge) to VIA Rail Station. Winnipeg: Quaternary Consultants Ltd. Submitted to Scatliff, Miller and Murray.
[ CRM report (18pp)(TFNP pdf, HRB) ]

Download Article 1 [ PDF Format ]

Bibliography List